The 44 controls / TS36
TS36 · Performance and monitoring
Monitoring connects Search Console, logs and deployments to decision dates.
Protocol wording · 0.1.0-draft.28 · Documentation view; no website assessment.
Control rule version : 0.1.0-draft.19
Reading guide: start with applicability and required evidence, then read expectations together with their limitations. Understand C, NC, NT and NA outcomes · Prepare a dossier
Expectations and evidence
- Required inputs (protocol identifiers)
- logs, search-console, change-history, intent
- When it applies
- Changes whose crawl/indexing follow-up is assessed.
- How to check
- Create a pre-change baseline, then verify at D+1, D+7 and D+30 according to risk.
- Expectation
- Baseline, deployment and risk-based follow-up observations are dated; anomalies and decisions are linked without automatic causal attribution.
- Evidence to retain
- Deployment log, crawl/indexing anomalies and signed decisions.
- Non-applicability
- No change subject to follow-up within the declared period.
- Limitations
- Temporal correlation is not sufficient to attribute a traffic change.
- Outcome clarification
- C requires all expectations across the declared scope. NC requires evidenced contradiction; otherwise NT. NA requires evidence of non-applicability.
- Reference scope
- Technical reference; the TSEP acceptance rule remains an editorial proposal.
Atomic rules
This control is documented in the protocol. This version does not yet attach executable atomic rules to it.