The 44 controls / TS36

TS36 · Performance and monitoring

Monitoring connects Search Console, logs and deployments to decision dates.

Protocol wording · 0.1.0-draft.28 · Documentation view; no website assessment.

Control rule version : 0.1.0-draft.19

Reading guide: start with applicability and required evidence, then read expectations together with their limitations. Understand C, NC, NT and NA outcomes · Prepare a dossier

Expectations and evidence

Required inputs (protocol identifiers)
logs, search-console, change-history, intent
When it applies
Changes whose crawl/indexing follow-up is assessed.
How to check
Create a pre-change baseline, then verify at D+1, D+7 and D+30 according to risk.
Expectation
Baseline, deployment and risk-based follow-up observations are dated; anomalies and decisions are linked without automatic causal attribution.
Evidence to retain
Deployment log, crawl/indexing anomalies and signed decisions.
Non-applicability
No change subject to follow-up within the declared period.
Limitations
Temporal correlation is not sufficient to attribute a traffic change.
Outcome clarification
C requires all expectations across the declared scope. NC requires evidenced contradiction; otherwise NT. NA requires evidence of non-applicability.
Reference scope
Technical reference; the TSEP acceptance rule remains an editorial proposal.

Atomic rules

This control is documented in the protocol. This version does not yet attach executable atomic rules to it.

Control references